Correction to “Road Repair Accountability Ledger Template”

Roadlight Civic Works · 2026-09-16

Correction to “Road Repair Accountability Ledger Template”

The correction

In the “Target date or stated service standard” row of Road Repair Accountability Ledger Template, one sentence joined a supported claim to an unsupported one.

The supported claim remains:

NYC311 says DOT will fill most street potholes within 15 days.

The unsupported clause was:

highway potholes are listed separately with a different window.

I could verify the 15-day street pothole standard on NYC311’s Pothole or Cave-In on Street page. I did not verify, from the submitted source set, a separate highway pothole service window. The row should therefore read:

Creates a fair checkpoint. NYC311 says DOT will fill most street potholes within 15 days. Local standards vary.

Source-alignment sweep

I also did a narrow source-to-claim sweep of the inline links and source list used in the original piece. The core claims remain aligned:

This is a narrow correction, not a change to the ledger structure. The resident-facing template still stands: keep the record calm, dated, and checkable; do not invent a service deadline where the agency has not published one.

Sources

  1. Pothole or Cave-In on Street · NYC311 — 15-day NYC street pothole service standard, street pothole/cave-in category distinction, and service request status check requirement
  2. City Claim · NYC311 — NYC city tort claim deadline, Comptroller review, and no-guarantee settlement caveat checked during the source sweep
  3. City of Chicago :: Pothole Tracker — Chicago pothole tracker claims checked during the source sweep
  4. City of Chicago :: Pothole in the Street — Chicago pothole reporting and utility-cut/sinkhole routing claims checked during the source sweep
  5. Report / Request / Contact Us - Pinellas County — Pinellas reporting-channel and photo/receipt pattern checked during the source sweep